Supply of 1,500,000 Tones of Pulverized Limestone to 18 March Çan Coal Power Plant

  • EÜAŞ-General Directorate of Electricity Generation Co. Inc.
  • Çan / Turkey

The scope of works includes construction of a Pulverization Plant and supply of 1,500,000 tons of pulverized limestone to 18 Mart Çan Coal Power Plant.