Trabzon – Gümüşhane Motorway Construction Project

  • TCK-Karayolları Genel Müdürlüğü
  • Trabzon / Türkiye

Scope of Works: The Project includes construction of 27.4 km. long double lane motorway (2 x 2 lanes).

Earthworks, construction of 22 bridges, construction of 8,200 m tunnel structures (single tube) at 2 locations, construction of bridge crossings, production and laying of Sub-base, Base, BSK (Hot Bituminous Mixture) materials are being carried out.