DIYARBAKIR-MARDIN HIGHWAY CONSTRUCTION

Project includes  production of 70.0 km length divided road. As Part of the Project; has been made 800.000 m³ earthwork, 25.380 m³ concrete work, 30.000 m³ stone wall work, 745.000 tons infrastructure groundwork and production of basic material and laying of this with hot mix include with bitume and laying Works.